Underground Utility Installation & Trenching in Central Ohio

Getting utilities from the road to the building is where a lot of rural builds stall out. We trench and install underground water, sewer, gas, electric, and communications conduit, bedded properly, buried to the right depth, tracer-taped, and compacted so you are not repairing a settled trench in two years.

We work with builders on new construction and directly with property owners running service to a shop, barn, second home, or outbuilding. Every job starts with an OUPS 811 locate.

Three parallel leach field lateral lines of perforated pipe laid in open trenches with PVC distribution header across the front

Scope of work

What this service covers

  • Water service line trenching and installation
  • Sanitary and storm sewer lateral installation
  • Gas line trenching (utility-coordinated)
  • Primary and secondary electric conduit
  • Fiber, phone, and low-voltage conduit runs
  • Service runs to barns, shops, and outbuildings
  • Sand and stone bedding, tracer wire, and warning tape
  • Road bores and driveway crossings
  • Trench compaction and surface restoration

How it goes

The sequence, step by step.

You should know what happens next at every stage. Here is how we run this job.

  1. 01

    OUPS locate

    811 called and marks verified before a bucket touches ground. Non-negotiable, on every job.

  2. 02

    Route and depth planning

    We plan the route around existing utilities, septic fields, and tree lines, and set depth to code and frost line for each utility type.

  3. 03

    Trench, bed, and install

    Trench opened and shored, pipe or conduit bedded in sand or stone, tracer wire and warning tape installed above.

  4. 04

    Compact and restore

    Backfill compacted in lifts so the trench does not settle, then graded, topsoiled, and seeded or restored to match.

Common questions

Underground Utility Installation FAQ

Real answers, including the numbers people actually want.

It varies by utility. Water lines go below the frost line, generally 36 inches or more in our part of Ohio. Electric conduit depth depends on voltage and whether it is direct-buried or in conduit. Gas is set by the utility. We bury to the governing code for each line, not to whatever is convenient.

Yes, that is one of our most common jobs. We trench the run, install conduit and water line in the same trench where code allows the separation, and coordinate with your electrician on the terminations.

Most residential service runs are a one to two day job once locates are clear. Longer runs, rock, or road crossings add time. The 48-hour OUPS notice is usually the real scheduling constraint.

Yes. We compact the backfill in lifts so the trench does not settle into a rut, then grade, topsoil, and seed. A trench we dug should not be findable a season later.

Free Estimates

Need underground utility installation?

Free site visit, written estimate, and a straight answer on whether you need the full job or a smaller fix.